Extension of timelines on (a) Issuance of Electronic Policies and (b) dispensing with physical documents and wet signature on the proposal form in respect of health insurance policies – IRDAI
View PdfExtension of timelines on (a) Issuance of Electronic Policies and (b) dispensing with physical documents and wet signature on the proposal form in respect of health insurance policies – IRDAI
- In partial modification of Clause No. 5 of the above referred guidelines dated 10.9.2020 insurers are allowed to issue electronic policies and dispense with physical documents and wet signature on the proposal forms as specified in the within referred guidelines up to 30.9.2021.
- All other provisions of the above referred guidelines remain.
