RajasthanPCB Notifies the List of Documents to Be Submitted While Applying for Consent to Establish – CTE and Consent to Operate– CTO(Order dated – 01.07.2021) – Rajasthan Pollution Control Board

  • 08th, July 2021
  • compfie_wp
  • Comments (0)
View Pdf

RajasthanPCB Notifies the List of Documents to Be Submitted While Applying for Consent to Establish – CTE and Consent to Operate– CTO(Order dated – 01.07.2021) – Rajasthan Pollution Control Board

  • Check list:
    • General Checklist of documents to be submitted/uploaded while applying for Consent
    • to Establish under Water (Prevention and Control of Pollution) Act, 1974 an Air (Prevention and Control of Pollution) Act, 1981 and applicable fee: Annexure A
    • 2 Specific Sector-wise Checklist of documents to be to be submitted/uploaded along with documents as per General Checklist while applying for Consent to Establish under Water (Prevention and Control of Pollution) Act, 1974 an Air (Prevention and Control of Pollution) Act, 1981 and applicable fee: Annexure B
    • General Checklist of documents to be submitted/uploaded while applying for Consent to Operate under Water (Prevention and Control of Pollution) Act, 1974 an Air Prevention and Control of Pollution) Act, 1981 and applicable fee: Annexure C
    • Specific Sector-wise Checklist of documents to be to be submitted uploaded Along with documents as per General Checklist while applying for Consent to Operate under Water (Prevention and Control of Pollution) Act, 1974 an (Prevention and Control of Pollution) Act, 1981 and applicable fee: Annexure D.
    • Performa for Self-Certification on letter head for Consent to Establish: Annexure E.
    • Performa for Self-Certification on letter head for Consent to Operate Annexure F.
    • Format for Certificate of Capital Investment: Annexure G.
    • Generic structure of Feasibility Report: Annexure H.
Know how we make compliance
possible for 100+ Industries – Aparajitha Logo